Buildings

Whe were buildings built? The Victoria Rosario Bridge was built in 1997 The General Libertador Bridge was built in 1972 The third Bridge was Built in 1982 Who was the enginer/ architect/ etc? The engineer who executed Victoria Rosario Bridge was Angel Piagio the association of engineers that executed General Liberating Bridge was the association of engineers of Uruguay The enginer who executed Third Bridge Was Abdo Benitez 3  How long did it take to make the bridge building? Victoria Rosario Bridge took five years to build The General Liberating Bridge took six years to build the third bridge took 4 years to buil

Sentences

Comparative sentences: 1) General Libertador bridge is longer than Third Bridge and Victoria Rosario Bridge 2) Victoria Rosario Bridge is more recent than General Libertador Bridge and Third Bridge 3) third bridge is smaller than General Libertador Bridge and Victoria Rosario Bridge 4) Victoria Rosario Bridge is wider than Third Bridge and General Libertador Bridge 5) General Libertador Bridge is more attractive than Victoria Rosario Bridge and Third Bridge Superlative sentences: 1) General Libertador is the oldest bridge 2) Victoria Rosario is the most interesting bridge 3)  General Libertador is the longest bridge 4) Third Bridge is the tallest Bridge 5) General Libertador isn’t the widest Bridge

Soil Compactor

Imagen
Soil Compactor The engine, it is made of aluminum and Steel, because   it is light and stong, the handlebar, it is made of Steel, because it is strong, the vibrating box, it is made of Steel, the base, it is made of Steel for resistant, the chassis, it is made of Steel for strength to. The engine, handlebar and the base is attached to chassis by welding, The vibrating box is fixed to chassis by   screws The task of the Handlebar is control the machine.The job of the Engine is energize the vibrating box.The function of the Vibrating box is vibrate the base.The job of the Base is compact the soil

Interview

Do a search about a future project in your city. Prepare an interview similar to the one in the text. Cherri: What a project are you working on now? Engineer Juan: we re desingning the San Rafael longest bridge. Cherri Where will it be? Juan: It ll connect la isla with el Molino. Cherri: What are the specifications of the bridge? Juan: It will be almost 2 km long. In our design, the bridge will have one span. Each Span will be 1400 m. Cherry: Many engineers think you won`t be able to build this bridge. Juan: I don`t agree. I think we`ll complete it around 2025.

Incident

Accident report Name: Agus Stopo Date :18th octubre Location: My house Description of incident I was in my house yesterday. There was a problema wiht oven. Then I saw accident. He burnt her finger. Wound healing First I washed my hands. Second I puto n disposable gloves. Then I cleaned the burn under running wáter. After that, I dried the burn using dressing. Finally, I covered the burn whit dressing.            